Installing/Mounting The Ges R2 Floor Socket; Required Tools; Preconditions; Basic Working Method - OBO Bettermann GES R2 Instrucciones De Montaje

Toma de suelo
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installing/mounting the GES R2 floor socket

WARNING
32 | EN
11
Installing/mounting the GES R2 floor socket
Danger to life from electrical current!
Contact with electrical current can lead to an electric shock .
Fatal or series injuries are possible .
Electrical work may only be carried by specialist personnel with electrical
training!
11 1

Required tools

Battery-operated screwdriver or
screwdriver
11 2

Preconditions

On the construction side, there must be a floor opening Ø 122 mm
with cable routing .
Run the cables out of the floor opening .
11 3

Basic working method

OBO Bettermann recommends mounting and installation in the
following sequence:
1 . Mounting of the installation socket
2 . Installation of the cover plates
3 . Mounting of the lid
OBO Bettermann

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

7428526

Tabla de contenido