UNIT INSTALLATION

WARNING: check that the power supply is disconnected before
performing operations on the unit.
WARNING: the electrical connections, the installation of the fan coils
and relevant accessories should be performed by a technician who
has the necessary technical and professional expertise to install,
modify, extend and maintain plants, and who is able to check the
plants for the purposes of safety and correct operation.
The fancoil should be installed in such a way as to facilitate routine (filter
cleaning) and special maintenance operations, as well as access to the air
breather valve on the side of the unit frame (connector side).
The assembly site must be chosen in such a way that the maximum and
minimum ambient temperature limits are respected 0÷45°C (<85% U.R.).
To install the unit, proceed as follows :
- Remove the air filter (Chapter "Drawings" Fig.4).
- Undo the screws and remove the housing (Chapter "Drawings" Fig.5).
- In case of wall-mounted FCZ-A unit, keep a minimum clearance of
80 mm from the floor. In the case of floor-mounted units on feet, refer

ELECTRICAL CONNECTIONS

WARNING: check that the power supply is disconnected before
performing operations on the unit.
WARNING: the electrical connections, the installation of the fan
coils and relevant accessories should be performed by a technician
who has the necessary technical and professional expertise to
install, modify, extend and maintain plants, and who is able to
check the plants for the purposes of safety and correct operation.
CONNECTION CABLES SPECIFICATIONS
Use H05V-K or N07V-K type cables with 300/500 V with insulation, piped
or ducted.
All the cables must be piped or ducted until they are inside the fan coil.
The cables coming out of the pipe or duct must not be subject to
stretch or twist. They must be protected from weather conditions.

ROTATING THE COIL

ROTATION BATTERY
If for reasons of water connections, it was to turn the battery, proceed as
follows:
Remove:
1.
the cloak
2.
the small control panel and related connections to the terminal
block
3.
the battery cover
4.
battery
5.
the partially cut or the plastic plugs of the right side dedicated to
water connections, the terminal block and jumper grounding
6.
the partially cut or the plastic plugs of the left side dedicated to
the grommet
7.
the condensate drain from the bath
&
IT
EN
to the instructions supplied with the accessory.
- Use expansion plugs (not supplied) to secure the unit to the wall
(Chapter Drawings Fig.6).
- Make hydraulic connections (Chapter Drawings Fig.7).
Refer to the dimensional data for the position and diameter of the
hydraulic connections.
Insulate water lines adequately.
The condensate drain system should be of an adequate size and
be positioned to favour runoff (min. 1% slope). If condensate is
drained into the sewage system, install a siphon to prevent return of
unpleasant odour into the room.
- Make the electrical wirings as shown in the wiring diagrams (Chapter
Drawings Fig.8).
- Refit the air filter.
Stranded wires can only be used with terminating sleeves. Make
sure that the strands of the wires are inserted properly.
When making the connections, follow the wiring diagrams supplied
with the equipment and shown in this document.
Wiring diagrams are constantly updated. It is therefore compulsory to
refer to the ones supplied with the unit.
To protect the unit against short circuits, fit an omnipolar magneto-
thermal trip 2A 250V (IG) to the power line with a minimum contact
opening distance of 3 mm.
Each control panel can control a single fan coil.
The control panels only comprise electric circuits connected to a power
supply of 230V;
Turn the battery following the direction of rotation indicated in the
figure depending on the model in possession
Reassemble in sequence:
battery
the battery cover
the plastic plugs supplied with, the holes left to water connection
the condensate drain pan and slide it on the opposite side
the plastic plugs of the condensate drain pan
moving the grommet on the opposite side
the terminal, the jumper grounding
The control panel on the left side of the cape, and restore the
electrical connections.
FR
DE
ES
15