Caution!
While turning the union nuts (c), use an open-end spanner to hold the water volume
regulators (d) in place.
11.3 Remove the flush connector (e) and the existing seals.
11.4 Mount the fitting (f) with new seals.
11.5 Open the water volume regulator.
11.6 Check the water connections for leaks.
11.7 Mount the frame (g) horizontally.
11.8 If necessary, shorten the spacers (h) to fit between the front edge of the recessed
cabinet and the surface of the tiles.
11.9 Install the line connections between the electronic module, the solenoid valve unit
and the opto-sensor.
A: Solenoid valve unit
B: Actuator 2 (optional)
C:0-10 V analogue output
D:Cold water temperature sensor (optional)
E: Hot-water temperature sensor (optional)
F: Connector for a sensor to be provided by the customer (e. g. door contactor)
G:Opto-sensor
H:Electric T-junction system lines (Power)
K: Electronic module
11.10 Optional: Connect the second sensor.
i ... Adapter line for sensors
k ... Door contactor
l ... yellow
m ... brown
11.11 Optional: Connect the third sensor.
i ... Adapter line for sensors
n ... Release for handicapped users
o ... white
p ... green (use in conjunction with 2/3 Y-sensor junction, core colour "yellow")
11.12 Hook-in the cover plate (r) on to the top of the tongues in the frame and attach.
11.13 Use the screws (s) to fix the cover plate at the bottom.
11.14 Remove the protective film from the shower panel.
11.15 Seal the shower panel (e.g. with Chromol, not part of the scope of delivery, see
Accessories,
Chapter
18).
- 7 -