8. Safety inspection

The safety inspection is required to guarantee operational safety of the lift. It is to be done:
1. before first commissioning after setting up the lift
use the "single safety inspection" form
2. After first commissioning, check regularly at least once per year.
Use the "regular safety inspection" form
3. After changes to the lift system construction
Use the "extraordinary safety inspection" form
Single and regular safety inspections must be done by a specialist. It is recommended
to do maintenance at the same time.
After structural changes (for example changes to the load carrying capacity or
changes to the lift height) and after significant
repairs on load carrying parts (e.g. welding work), an inspection is required by an
expert (extraordinary safety inspection).
This inspection book contains forms with a printed inspection plan for safety inspections. Please
use the appropriate form, record the condition of the inspected lift and leave the completed form
in this inspection book.

9.Assembly and commissioning

9.1 Set up guidelines

Lift set up is done by trained manufacturer personnel or a contract partner. If the operating
company has appropriately trained assemblers, the lift can also be set up by them. Set up is
to be done according to the assembly instructions.
A standard lift may not be set up in explosion endangered spaces or wash halls. (Consult
with your dealer)
Before setting up, verify that there is a sufficient foundation or make it according to the
guidelines in the foundation plan. The set up location must be level and even. Foundations in
open air and spaces where winter storms or frost are to be expected, must have a
foundation to frost depth. The operating company is solely responsible for the set up location
of the lift.
An on-site electrical connection of 3 ~/N + PE, 400V, 50Hz is to be provided. The supply line
is to be correspondingly secured on-site. The connection point is on the operating unit.