Multicontrol Quadro; Putting The Lifting Column Into Operation; Putting A Single Lifting Column Into Operation - Phoenic Mecano Alpha Colonne Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7.7.4 MultiControl quadro

7.8 Putting the lifting column into operation

Only authorised personnel may put a lifting column into operation. The safety regulations and
instructions in this assembly manual must be read and observed.
Check the lifting column far any signs of damage before you start the commissioning and then
refer to the instructions regarding the operation of the lifting column.
If no damage can be detected, then the lifting column can be put into operation.
The lifting column in the Hall sensor version can be used both on its own and in conjunction with
a number of lifting columns of the same design.

7.8.1 Putting a single lifting column into operation

Check that the lifting column is in a safe state.
Insert the connector of the lifting column supply line in the connecting socket of the controller
marked for the drive.
Insert the connector of the hand switch connector in the connecting socket of the controller
marked for the connector assignment.
Test the function for moving the lifting column up and down by pressing the relevant key on
the manual control switch.
When moving the lifting column up and down, take note that the internal end switch swit-
ches off the motor in the upper and lower end positions, thus when reaching the max. lifting
route.
7. Life phases
General details /
operating conditions
Max. switching dura-
tion
Input voltage
Output voltage
Power
Current output
Protection class
Mains cable length
20 per cent (with 10
minute play dura-
tion)
230 VAC and 115
VAC available
36 VDC
300 VA
max. 12 A
IP 30
1.5 m
65

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

B.015470

Tabla de contenido