Flotec FPCC5030 Manual Del Usuario página 11

Sistema de batería de respaldo
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Link
O
Setup
2
Battery Backup Internet Connection and
Alerts Configuration
1. Complete the Battery Backup Registration, Internet
Connection and Alert Configuration BEFORE con-
necting the battery and AC power supply to your
BBU.
NOTICE If you have already connected the battery
and AC power supply to the BBU before connecting
to to the internet, complete the device registration
process. Then disconnect the battery and remove the
AC power supply from the BBU panel and gateway
for 2 minutes in order to reset the panel. Resume
with Step 8.
2. Go to mylink2o.com and select "sign up" (or Login if
you have an existing account).
3. Follow the online instructions and enter the required
personal information to create a new user account.
4. Register your device using the Unique Device ID Key
included on the device and your manual cover.
5. The Alerts will use the e-mail(s) and phone number(s)
entered here.
6. Find an open network connection on your internet
router or other hardwired connection (like an internet
switch).
7. Rotate the Gateway antenna up on the gateway. Us-
ing the supplied 1 meter Ethernet cable (or a longer
cable if necessary) Connect the Gateway to the open
internet port.
NOTICE We recommend the use of an uninterrupted
power supply for your internet modem, home router
and the gateway power supply.
8. Connect the Gateway power supply to a 115 VAC
outlet, plug the cord into the back of the Gateway.
• The Gateway will blink red for a few seconds.
• When the LED becomes solid Green or solid
Green with an occasional blink – your Gateway
is communicating with the Link2O server. If not,
refer to Gateway Trouble in the manual.
9. Connect the red positive (+) charger/controller lead
wire to the positive (+) (red) battery terminal. Con-
nect the black negative (-)charger/controller lead wire
to the negative (-) (black) battery terminal.
10. Connect the Charger Power Supply cable (supplied)
to the Charger/Controller's Power input jack. Plug
the other end into a 115 VAC outlet.
11. Check the AC power LED on the Controller – if it is
solid green the unit is communicating with the WEB
site.
12. Verify the system is operational by pressing the 'TEST
SYSTEM' button and observing the test sequence.
13. Test communication by clicking the "Test" icon on
the web page and verify the unit has run the test.
14. Using the drop down menu configure the desired
method of Alerts you want to receive (Text or E-mail).
15. Alerts can be tested by activating the pump with the
float switch.
11

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido