Commissioning; Normal Operation; Servicing/Maintenance/Cleaning; Lubrication - RK Rose+Krieger PLM-II Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

7. Working life

7.3 Commissioning

Only those persons who have read and understood these installation instructions completely may
start the linear unit.
Forces arise when this linear unit is in operation which can lead to damage to persons or property.
It is imperative that you obey the safety rules and the limits of the linear unit.

7.3.1 Normal operation

Check the linear unit when in operation regularly for correct performance of its function.
In normal operation, look out for detectable changes to the incomplete machine. Should faults
arise, the linear unit is to be shut down immediately in order to avoid damage.
The operating instructions for the complete machine in accordance with Machine Directive 2006/
42/EC are an essential component of a complete machine.

7.4 Servicing/maintenance/cleaning

7.4.1 Lubrication

Before starting any work on the linear unit, any electrical drives used are to be pro-
tected against accidental switching on.
Lubrication is applied directly to spindles.
Lubricant recommendation: off the shelf roller bearing greases, which must not be mixed with
each other.
Lubricating interval: every 200-500 hours run

7.4.2 Masking tape

Take care when working with masking tape as there is a risk of cutting yourself.
Only undamaged masking tape can be installed. You must exchange the masking tape if it is
buckled, cracked or kinked. The masking tape for your linear unit is defined by its length on your
linear unit. Perfect functioning can only be guaranteed if the length of the masking tape is ideal.
44

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Plm-g-ii

Tabla de contenido