Quality Espresso FUTURMAT SENSIUS Manual De Instrucciones página 21

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation of the drain hose
3
Remove the drainage tray and connect the corru-
gated hose, supplied with the machine, to the
drainage tray outlet (see figure), before finally con-
necting the other end to the general drainage sys-
tem of the establishment.
i
It is important that the drain hose is com-
pletely straight and does not hang loose to
enable good drainage.
Operation
5
Press the main switch, located at the base of the
machine. When the machine switches on, the
switch will light.
After switching on, the electronic control unit de-
tects that there is no water level in the boiler, acti-
vating the solenoid valve and the pump, which both
remain active until the level gauge detects the cor-
rect water level. During that process, the action
lights (under the touch pads) will light from left to
right repeatedly. When finished, the boiler heating
element will then be activated, heating the whole
system.
The main switch is located on the
lower right part of the machine,
near the front foot.
i
If the control unit does not detect water level in
the boiler for a certain duration, all the LEDs of
the programmable buttons will flash continu-
ously in red colour. The alarm will disappear
with the turning off and subsequent turning on
of the machine. (see section 6, page 26)
Drainage tray outlet
Electrical connection
4
Connect the machine to a suitable connection, in
line with current electrical regulations.
Connect the machine according to the mains volt-
age of the establishment as indicated on the label
attached to the installation cable, see figure a).
i
You should not use any type of extension cords
or power strips to connect the machine to the
power supply.
The power connection cable should never be
rolled up, but instead should be fully extended to
prevent possible overheating.
Purging the group heads
6
Place the portafilter in the brew group and press the
continuous coffee button to purge the group head;
let the water flow for around 30 seconds and wait
until the machine reaches working temperature,
checking that the gauge shows 1 bar pressure in
the boiler.
7
While the machine heats up, install the grinder
and adjust the grind fineness and dosing.
Once the machine has reached working tempera-
8
ture and you have adjusted the grind fineness,
you can program the coffee dosing (see section
3.3, p. 22).
21
Electrical
connection
label
Figure a)
1 bar working pressure
EN

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Gaggia visacrem vetro

Tabla de contenido