INSTALLATION
To operate a good installation of the barrier POPPER
follow these instructions:
Locate inside the property the correct point to install
POPPER. Check that the provided opening
CLOCKWISE is correct. In case you need invert the
opening direction see the capitol "Inversion of
opening direction". Build up a cement emplacement
with sizes like
fig.
1, foreseeing the passing of the
protective coverings "G" for the passing of the power
supply and control system cables. Before that the
cement solidifies, install the barrier on its bracket "Ps"
(Optional) immersing it in the cement and making
sure that the bracket "Ps" is oriented and perfectly on
level
(fig.
1). If you have a solid point of support you
can fix the barrier on the ground with screws and
plugs without utilizing the bracket "Ps". After that the
cement is perfectly solidify install the barrier POPPER
on the bracket "Ps" or on the fixing plugs and fix it
slightly with the nuts supplied "D" or with the plugs
screws
(fig.
2). Adjust the barrier inclination with the
grub screws "E"
(fig.
2).
WARNING
Not dismantle in any case the boom when it is in
the horizontal position. Never carry out the
emergency manoeuvre when the boom is not
installed.
Install the boom of the barrier and carry out the
emergency or manual manoeuvre (see the par.
"Emergency or manual manoeuvre"), put the boom
in the horizontal position. Loose the nuts or screws
"D" and move on the right or on the left the barrier
POPPER in its slots "Fr" in order to adjust the boom
with the space you have to close
TO ADJUST THE MECHANICAL STOPS
Unscrew the 2 screws "V1" of the support of electrical
limit switches
(fig.
4). Carry out the emergency or
manual manoeuvred (see par. "emergency or manual
manoeuvre) and put the boom in the vertical position.
Using two fix keys meas. 17 loose the fixing nut "D1"
and screw or unscrew the screw "F1" in order to
obtain the wished position of vertical stop and so fix
the nut "D1"
(figure
4). Put the boom in the horizontal
position, loose the nut "D2" and adjust the mechanical
stop "F2" in order to obtain the wished position of
horizontal stop and so fix the nut
Reassemble with the screws "V1" the support of the
electrical limit switch
manual manoeuvre open and close the barrier to
verify the correct functioning.
TO ADJUST THE ELECTRICAL LIMIT SWITCH
With a manual manoeuvre put the boom in the
vertical position and rotate the more internal cam
"Ca" to crush the limit switch, remind that this limit
switch control a slowing down of boom movement to
(fig.
3).
"D2"(fig.
(fig.
4). When you finish the
the mechanical stop, you can decide the time of this
slowing down moving away or drawing up the cam to
the limit switch
the boom in the horizontal position and rotate the
more external cam "Cc" to crush limit switch, remind
that this limit switch control a slowing down of boom
movement to the mechanical stop, you can decide the
time of this slowing down moving away or drawing up
the cam to the limit switch
TO INVERT THE OPENING DIRECTION
With a manual manoeuvre put the boom in the
vertical position, so put in automatic system the gear,
for safety reason take out the boom from the barrier.
Take care, unhook the springs "MB" from the supports
"S1" - "S2"
(fig.
7). Dismantle the pivot supporting the
cams "Pc" unscrewing the screw "V" situated in the
middle of the same
limit switch support taking away the two screws "V1"
that fix it
(fig.
8). Remove the lever "Ls" dismantle the
mechanical stop "F2" from its right hole and screw it
in its left hole
(fig.
of 60° in clockwise
support and the pivot supporting the cams "Pc". Hook
the springs "Mb" to the supports "S1" and "S3"
and reinstall the boom. Carry out the circuitry like in
the control panel manual and mount the obligatory
safety devices. Teach the people intended for the use
of the automation about the controls, safety devices,
emergency manoeuvre and dangerousness deriving
from the utilize of the automation. Compile the
technical booklet and fulfil the eventual obligations
deriving from the regulations in force.
We guarantee the correct functioning of the
barrier POPPER only and exclusively if provided
with DASPI safety devices and only if combined
with the original control panel.
EMERGENCY OR MANUAL MANOEUVRE
You have to do the emergency or manual manoeuvre
or during the installation, or only if the automation
does not work properly or if there is not power supply.
Never carry out the emergency or manual
manoeuvre when the boom is not installed in the
automation system.
Never dismantle the boom of the barrier until it is
in the horizontal position.
CUT OFF THE POWER SUPPLY.
Open and remove the safety carter using the supplied
key "Ch"
(fig.
9). Find the release pivot "Pe" situated
5)
behind the lever "Ls"
supplied Allen key meas. 5 "Ch1" turn the pivot "Pe" to
free the gear
(fig.
To re-establish the normal automation functioning,
replace the key "Ch1" in the initial position so remove
the key and close with the key "Ch" the safety carter.
Place the keys "Ch" and "Ch1" in a safety place known
exclusively from the people intended for the use of the
automation. Switch on the power supply, pay attention
that there's nobody where the barrier is moving.
(fig
6). With manual manoeuvre put
(fig
6).
(fig.
8). Dismantle the electrical
8). Reinstall the lever "Ls" turning it
(fig.
8). Reinstall the limit switch
(fig.
10). Without force using the
10).
(fig.
8)

Publicidad

Tabla de contenido
loading

Productos relacionados para Daspi POPPER Serie

Este manual también es adecuado para:

Popper speedPopper 24

Tabla de contenido