Option 2: Installation To The Wall With Wall Brackets - PAW MVW DN 25 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5 Assembly [specialist]
5.2

Option 2: Installation to the wall with wall brackets

1. Choose the position for installation.
2. You need one set of wall brackets (PAW item no. 34721). Copy the mounting holes
of the brackets to the mounting surface. Observe the hold points on the low-loss header.
Drill the holes.
3. It is mandatory to use appropriate screws and wall plugs. Before the assembly,
check if the enclosed mounting equipment is suitable for the location of installation.
4. Drill the holes and insert the wall plugs.
5. Fix the wall brackets to the wall by using the enclosed screws and washers.
6. Take the low-loss header out of the insulating shell.
7. Put the low-loss header onto the wall brackets. The different holes in the wall bracket
allow for different centre distances between the manifold and the wall. Choose the
largest distance to the wall. It is thus easier to mount the insulating back shell.
8. Screw the low-loss header onto the wall brackets with the enclosed washers and nuts.
B-7
Connections for heating circuits
Connections for boiler
993x42x3-mub-ml – V01
2017/01

Publicidad

Tabla de contenido
loading

Productos relacionados para PAW MVW DN 25

Este manual también es adecuado para:

Mvw dn 32

Tabla de contenido