About The Boiler; Commissioning - Riello MINI 11 Manual De Uso

Ocultar thumbs Ver también para MINI 11:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
RIELLO MINI

1.3 About the boiler

RIELLO MINI is a gas boiler with airtight cham-
ber and forced draft for the instantaneous
production of domestic hot water. Suitable to
operate with methane gas or with liquefied pe-
troleum gas (LPG).
The electronic control, the automatic ignition
and the continuous modulation allow to main-
tain the delivered water temperature constant
and to reduce the consumption of gas.
CONTROLS INTERFACE
Main switch
Off
A
On
Temperature control
B
Allows to set the domestic hot water
temperature
Green signal
Flashing light to indicate the presence of
C
the power supply.
Fixed to indicate that the burner is on.
Red signal
D
Lights if a burner lockout occurs
C
B
A
D

1.4 Commissioning

The first start up of the RIELLO MINI boiler
should be carried out by the Technical Assis-
tance Centre after which the boiler will be able
to operate automatically.
It may, however, be necessary to restart with-
out involving the Technical Assistance Centre:
for example after a long period of absence.
In such cases, the following checks and opera-
tions must be carried out:
− Check that the gas shut-off valve and water
taps are open
− Access the controls by pressing the top part
of the cover, lifting up the bottom edge and
allowing it to rotate carefully
− Turn the dial to "ON" and check that the
green light flashes
− Turn the temperature control (B) by about
two thirds, if it has not already been set
12
C
B
A
D

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mini 13Mini 17

Tabla de contenido