7.7.2 Performing an initialisation run
The initialisation run can be performed as follows with any hand switch if error E000,
E010 or E021 is present:
Error messages will only be indicated on the 6-key hand switch!
•
Ensure that all drives and controllers are interconnected and that the mains plug is not con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
•
Keep the DOWN key
•
Plug the mains plug in and wait for about 5 seconds.
Note: The software release (e.g. "0217"), the type of lifting column connected (e.g. "-20-")
and "[In d]" appears in hand switches with display.
•
Release the DOWN key
•
Press the DOWN key
end stop.
Note: When the lower end stop is reached, "[In U]" appears in the display.
•
Press the UP key
stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN key
the drives.
The initialisation run is complete. The controller is now ready for operation. The operation of the
2-key or 6-key hand switch is described in sections 7.11 and 7.12.
on the hand switch pressed.
.
again and keep it pressed until all drives have moved to the lower
and keep it pressed until all lifting columns have moved to the upper end
pressed for 5 seconds. The position is the new end stop for
7. Working life
49