CAUTION
Risk of injury due to falls or bumps
Bruising from falls or bumps on system components during installation.
•
Wear personal protective equipment (helmet, protective clothing, gloves, safety boots).
Note!
Confirm that installation and start-up have been carried out correctly using the installation, start-up and maintenance certificate. This
action is a prerequisite for the making of warranty claims.
–
Arrange for specialist personnel to carry out commissioning and annual maintenance.
6.1
Incoming inspection
Prior to shipping, this device was carefully inspected and packed. Damages during transport cannot be excluded.
Proceed as follows:
1.
Upon receipt of the goods, check the shipment for
•
completeness and
•
possible transport damage.
2.
Document any damage.
3.
Contact the forwarding agent to register your complaint.
6.2
Preparatory work
Condition of the delivered device:
•
Check all screw connections of the device for tight seating. Tighten the screws as necessary.
Preparing the connection of the device to the plant system:
•
Barrier-free access to the plant system.
•
Level and solid installation surface for the device.
•
Frost-free, well-ventilated room.
–
Room temperature > 0 - 45 °C.
•
Electric connection.
–
230 V~, 50 Hz, 16 A with upstream ELCB (tripping current: 0.03 A).
6.3
Connection
Basic system variant Servitec Mini
1
Servitec Mini
2
Gas-rich water
3
Degassed water
•
Connection 2 x DN 15
•
Max. pipe length 5m
Note!
Shut-off valves must be used at the connection point to the pipe network.
Note!
We recommend connection to the existing pipe network using a flexible hose connection (especially in buildings with high noise
abatement requirements).
Servitec Mini — 01.08.2017 - Rev. B