Kohler K-682 Guia De Instalacion página 16

Ocultar thumbs Ver también para K-682:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Door
11. Installation Checkout
Turn on the water supply to the valve.
Test for Leaks without an Interface or Controller
Disconnect the power from the valve.
Open the access door on the valve.
Verify the power supply cord is connected to the appropriate socket.
Connect the jumper to the valve, then reconnect the power.
Wait 10 seconds for the valve to initialize; the outlets will activate.
Check all connections for leaks.
Disconnect the power, then remove the jumper.
Close the access door, then reconnect the power to the valve.
Test for Proper Operation (Requires an Installed Interface or Controller)
Turn on the main power supply. You should hear the valve power up and the user interface will be
lit.
If not already completed, set up the interface. Refer to the "Homeowners Guide" or "Users Guide"
for the interface or controller for your system.
Use the interface to turn on the water outlets.
Check for leaks and make any adjustments as needed.
Verify that the water flow is sufficient for your showering needs.
Exercise the Valve (Requires an Installed Interface)
NOTE: Valves which have been recently installed, or have not been used for some time should be
exercised before running tests or setting the maximum temperature.
NOTE: The maximum water temperature to the outlets is limited to 120°F (49°C). The valve will
automatically shut down if the temperature exceeds 120°F (49°C).
Verify that the hot and cold water supply lines are connected to appropriate valve inlets.
Using the interface, adjust the temperature from cold to hot and back to cold several times, pausing
for 30 seconds at each extreme.
Check Component Functions
1043183-2-E
Power
Supply
16
Jumper
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido