Honeywell HSB Y12 Guia De Instalacion página 25

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Natural Gas Vapor Installation (typical)
A
NG BTU = ft
Megajoules = m
A.
BTU and Pressure Decal
B.
Check Distance with Gas Provider
C.
Manual Shut Off Valve With Pressure Port
D.
Size Gas Meter for Generator Load Plus All Appliance Loads
E.
Flexible Fuel Line
F.
Sediment Trap
G.
For Underground Installations, Verify Piping System for Code Compliance
H.
Gas Main
Installation Guidelines For 60 Hz Air-cooled Generators
C
E
F
3
/h X 1000
3
/h X 37.26
Section 5: Fuel Conversion/Gas Connections
B
G
Figure 5-5.
D
H
000618a
21

Publicidad

Tabla de contenido
loading

Tabla de contenido