LG DLEXOOOITM Guia Del Usario E Instrucciones De Instalacion página 20

Secadora con vapor
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS
CONNECTING ELECTRIC DRYERS
(cont.)
WARNING:
• Connect
the power
cord to the terminal
block.
Each colored
wire should be connected
to same color screw.
Wire color indicated
on manual
is connected
to the same color
screw
in block.
Failure to follow these
instructions
may result in a short or overload.
• Grounding
through
the neutral
conductor
is prohibited
for: (1) new branch-circuit
installations,
(2) mobile
homes,
(3) recreational
vehicles,
and (4) areas
where
local
codes
prohibit
grounding
through
the neutral conductor.
Four-wire Connection for Electric Dryers: Direct wire
• A 4-wire connection
is required for all mobile
and manufactured
home installations, as well
as all new construction
after January 1, 1996.
• A UL-listed strain relief is required.
• Use UL-listed 4-wire #10 AWG-minimum
copper conductor cable.
• Allow at least 5 ft (1.5 m) length to allow for
removal and reinstallation of the dryer.
1" (2.5 cm)
I-_
Ground Wire
5"
(12.7 cm)
./
,J
Remove 5 inches (12.7 cm) of the outer
covering from the wire. Remove 5 inches
of insulation from the ground wire. Cut off
approximately
11/2inches (3.8 cm) from the
other three wires and strip 1 inch (2.5 cm)
insulation from each wire. Bend the ends of
the three shorter wires into a hook shape.
Terminal
Block
UL- Listed
Strain Relief
U L- Listed
4-Wire
Power Cord
Remove the terminal block access cover
on the upper back of the dryer. Install a
UL-listed strain relief into the power cord
through-hole;
then thread the power cable
prepared in Step 1 through the strain relief.
Hot
......
(Black)
(White)
(Red)
Ground
Ground Wire
Transfer the dryer's ground wire from behind
the green ground screw to the center screw
of the terminal block. Attach the two hot
leads of the power cable to the outer terminal
block screws. Attach the white neutral wire
to the center terminal block screw. Attach the
power cable ground wire to the green ground
screw. TIGHTEN ALL SCREWS SECURELY.
Reinstall the terminal block access cover.

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Dlgx0002tm

Tabla de contenido