ONE PIPE SYSTEMS
•
Remove the clamps for transporting the heat exchanger (Fig.21), as well as the plugs from top and bottom emitter sockets.
•
Also remove the rubber plugs heat exchanger.
CAUTION : The battery is supplied at a pressure of 1.5 bar pressure with nitrogen to ensure no leakage (Fig.21b).
•
Using the template provided on the back of the package,
mark on the wall the anchoring points (2 locations) for
the battery, taking into account the position of the water
inlets (right or left). Also, check the position of the four
attachment points of the outer cover, taking into account
the measurement of the taps/valves/fittings to be used.
•
Drill the holes carefully and insert a plug for each anchor
point. We recommend using 8 mm diameter plugs.
•
Position the heat exchanger.
•
Place the outer over onto the holes
34
Unit installation
Fig. 21
Fig. 21b
Fig. 22
Fig. 23