•
Using a small rubber hammer, open the holes in the co-ver enough to place the
inlets on the desired side and place the cover over the previously prepared holes
•
Connect the one-pipe keys and thermostatic valve. With one-pipe installa-
tions, the use of valves with a curve for the upper hot water inlet is required.
•
When
water
begins
per
bleeder
to
remove
•
Assemble the front panel. On models with HE system, replace the cover
plugs in the front holes.
to
fill
the
radiator,
air
inside
the
heat
Unit installation
use
the
up-
exchanger
.
Fig. 24
Fig. 25
Fig. 26
Fig. 27
35