•
Position the outer cover.
•
Using a small rubber hammer, open the pre-drilled hole in the cover enough
to make the electro thermostatic valve accessible.
•
Screw the thermostatic head and place the front. If the model has the HE
system, place the cover caps in the front holes.
Unit installation
Fig. 31
Fig. 33
Fig. 31
Fig. 32
Fig. 34
37