Load peaks, i.e. the highest average current (calculated on the basis of the integration
time set. Values can be reset).
6.2.2.2. Single-phase connection
This page displays the RMS current, maximum, average and minimum value, and
maximum demand (load peaks are calculated on the basis of the integration time set),
and the relevant voltages.
Minimum and maximum current values can be reset as well as the average value and
the maximum demand.
6.2.2.3. Auxiliary channel
Press
to access the page containing all the information regarding auxiliary
channel current. In the AUX Menu, the user can also access the other Auxiliary
Channel Menus (Voltages, Power, Counters, Harmonics, Waveforms) by selecting
them with the relevant function keys.
Press
to exit the Auxiliary Menu and return to the first page of the relevant menu.
6.2.3. Power menu
6.2.3.1. Three-phase or two-pase connection
The first page of this menu displays the active power (W) in each phase and in the
three-phase (or two-phase) connection and the corresponding PF values.
NOTE: as a norm, active power is shown as a negative when generated and a positive
when absorbed.
- 77 -