Hayward AQUA RITE pro Guia Del Usuario página 37

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46
Installation must be performed in accordance with Local codes.
230 V
POWER
PUMP
Preparing Pool/Spa Water
Refer to page 2 for recommended chemical levels. The pool's chemistry must be balanced
BEFORE activating the AquaRite Pro. NOTE: If the pool does not have new water, add 1
liter of metal remover and 1 liter of non-copper based algaecide to the pool, per manufacturer's
instructions. This ensures a quick, troublefree transfer to the AquaRite Pro system.
Mounting the AquaRite Pro Control
The AquaRite Pro is contained in a raintight enclosure that is suitable for outdoor mounting.
The control must be mounted a minimum 3.5 meters horizontal distance (or more, if local codes
require) from the pool/spa.
The control is designed to mount horizontally on a flat surface with the knockouts facing down-
ward. Because the enclosure also acts as a heat sink (disperses heat from inside the box), it is
important not to block the four sides of the control. Do not mount AquaRite Pro inside a panel
or tight enclosed area.
13 / 20
INSTAllATION
ELECTRICAL
BOX
LINE
SOLAR
SySTEM
FILTER
FROM
FROM
POOL
SPA
AquaRite Pro
LOAD
HEATER
or
HEAT
PUMP
FLOW
SWITCH
IN-FLOOR
CLEANER
ELECTROLyTIC
CELL
TO
SPA
TO
POOL
Rev. C

Publicidad

Tabla de contenido
loading

Tabla de contenido