Testing And Commissioning; Testing; Commissioning - Key Automation CT202 Instrucciones Y Advertencias Para Su Instalación Y Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
5 - TESTING AND COMMISSIONING THE AUTOMATION SYSTEM
The system must be tested by a qualified technician, who must
perform the tests required by the relevant standards in relation to
the risks present, to check that the installation complies with the

5.1 - Testing

All system components must be tested following the procedures de-
scribed in their respective operator's manuals;
ensure that the recommendations in Chapter 1 - Safety Warnings -
have been complied with;
check that the gate or door is able to move freely once the automa-
tion system has been released and is well balanced, meaning that it
will remain stationery when released in any position;
check that all connected devices (photocells, sensitive edges,

5.2 - Commissioning

Once all (and not just some) of the system devices have passed the
testing procedure, the system can be commissioned;
the system's technical dossier must be produced and kept for 10
years. It must contain the electrical wiring diagram, a drawing or
photograph of the system, the analysis of the risks and the solutions
adopted to deal with them, the manufacturer's declaration of con-
formity for all connected devices, the operator's manual for every
device and the system maintenance plan;
fix a dataplate with the details of the automation, the name of the
person who commissioned it, the serial number and year of con-
struction and the CE marking on the gate or door;
also fit a sign specifying the procedure for releasing the system by
hand;
relevant regulatory requirements, especially the EN12445 standard
which specifies the test methods for gate and door automation sy-
stems.
emergency buttons, etc.) are operating correctly by performing gate
or door opening, closing and stop tests using the connected control
devices (transmitters, buttons or switches);
perform the impact measurements as required by the EN12445
standard, adjusting the control unit's speed, motor force and de-
celeration functions if the measurements do not give the required
results, until the correct setting is obtained.
draw up the declaration of conformity, the instructions and precau-
tions for use for the end user and the system maintenance plan and
consign them to the end user;
ensure that the user has fully understood how to operate the system
in automatic, manual and emergency modes;
the end user must also be informed in writing about any risks and
hazards still present;
WARNING - after detecting an obstacle, the gate or door stops
during its opening travel and automatic closure is disabled; to re-
start operation, the user must press the control button or use the
transmitter.
EN
23
23

Publicidad

Tabla de contenido
loading

Tabla de contenido