The Rejection tube is connected with a quick connection
"Rejection" located at the rear of the equipment.
Using the drain flange:
Drill a 6.5 mm hole in the drain pipe
where the Rejection tube is to be
inserted.
Place the pad over the hole and the
drain flange on top, gripping the
pipe.
Secure it by tightening the
screws on both sides.
Insert the Rejection tube 5 cm,
through the flange.
Secure the Rejection tube with the
drain flange nut.
c. Tank level: The tank level is connected at the rear fitting "0"
and the level probe is inserted into the tank vertically through
the tank cover or by making a hole on the top. This hole must
be as tight as possible to the diameter of the tube, so that
Level
when inserting the level probe it shows some resistance.
The level probe must be inserted at least 15 cm and should be
as vertical as possible.
maximum level
The maximum water level in the tank will be at 11 cm from the
end of the level probe. When the water level falls about 7 cm,
the equipment will start and begin to produce water.
7.3 Equipment start-up
Once the hydraulic connections have been made, open the
stopcock and check for leaks at the connections made,
including the dispensing faucet.
Electrical connection:
First onnect the transformer plug-in to the equipment.
c
Then connect the transformer to the power system: The
equipment will start automatically.
Leave the equipment running until the tank is full.
The screen displays the conductivity value of the water
produced.
When the tank is full, the equipment stops the production of
water and displays the full tank icon.
The screen displays the conductivity value of the water
produced at the time the equipment stopped.