Mounting The Bead Breaker Arm; Mounting Of The Infl Ation Device For Tubeless Tires - Bosch TCE 4335 Manual Del Usuario

Máquina para montaje de neumáticos
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 58
en
28 | TCE 4335 | Initial commissioning
4.2.5

Mounting the bead breaker arm

1. Remove the external elastic ring and take off the hin-
ge rod from its housing in the bead breaking arm.
2. Remove the self locking nut.
3. Insert the bead breaking arm and centre the joint pin
with the bead breaking cylinder, ensuring that the
flat part of the joint pin (1) is facing the outside.
4. Insert the hinge-pin and put back in place the exter-
nal elastic ring.
5. Place the buffer spring on the provided tab and
screw in the bead breaking cylinder the self locking
nut.
Danger!
Wrong mounting of the bead breaking cylin-
der compromises machine functioning and
can be a serious danger for the operator.
During machine installation be sure that
the nut is correctly screwed in the bead
breaking cylinder rod (at least 10 mm).
|
1 695 106 642
2010-12-22
4.2.6
1. Install the air tank behind the column by fitting the 2
1
2. Insert the rubber pipe in the tank joint and fasten
3. Connect the gauge support to the column with the 2
Mounting of the inflation device for tubeless
tires
provided screws.
the hose clamp.
provided screws.
2
3
Robert Bosch GmbH

Publicidad

Tabla de contenido
loading

Tabla de contenido