Start-Up And Maintenance; Equipment Installation - Kinetico KUBE Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Avoid any external dripping liquids from pipes, wastewa-
ter, etc. Onto the equipment.
Should softened water be supplied to a hot water or
vapour generator, it will be necessary to install a depen-
dable check valve between the water softener and the
generator, in order to prevent hot water from returning
to the system and damaging it.
The existing pipelines must not have deposits of either
iron or limescale. Replace all pipelines containing a
great amount of iron or limescale deposits.
Drain pipe
Drain pipe
4 cm
aeration
Subterraniean drainage
Feed pipe
In the event that pipelines are blocked with iron, install
a separete iron filter unit before the water softener.
It is recommended valves are installed to take samples
for both treated and untreated water, as close as pos-
sible to the water softener.
If there are quick-closin valves, it is recommended to
install a device to prevent water hammers.
Precautions:
1. Reading and review: Carefully read all procedures,
guides and regulations before installing and using the
water softening equipment.
2. Treatment of chemicals:Avoid the presence of fla-
mammble products or materials as a safety measure for
preventing the risks of explosion and fire. Make sure to
use the glue and the cleaning prodict for PVC in a we-
ll-ventilated area.
3.Eye orotection: Wear safety goggles during the insta-
llation process to prevent any injury in your eyes, cau-
sed by the ejection of welding materials or matal and
plastic chips.
4. Welding: Use adequate protective aquipment to pro-
tect the exposed surfaces against the flame of the gun
or an excessive temperature inrease. Only use welding
guns WITHOUT LEAD.
5.Grounding: When installing a plastic pipe between two
metallic pipes, a grounding continuity.
6. Easy reach: Use a ladder for working at heights which
are out of reach. If you must work at heights for a pro-
longed period of time, use adequate safety devices.
ATTENTION: we recommend that the installation
is carried out by a qualified installer. Failure to
install the equiment in accordance with this ma-
User's manual
nual will render the Limited Warranty void.
If daytime pressure is heigher than 5.5 bars, nigh-time
pressure may exceed the maximum. Please use a pres-
sure-reducing valve if necessary (a pressure-reducing
valve may reduce the flow).
Note: The Limited Warranty of the equipment does not
cover any damages due to the freesing of the equip-
ment. If you have questions about KUBE water equi-
pment or if you think that it is not working properly,
contact your distributor.

5.3. START-UP AND MAINTENANCE

Drain pipe
The system must be periodically sanutused. See "Sec-
4 cm
tion 8" for further information. Manintenance should be
aeration
carried out by qualified techniclas who work under the
appropriate hygienic conditions. (For further informa-
tion contact to your installer).

6. EQUIPMENT INSTALLATION

The installation of the water softener must be carried
Sink outlet
out by skilled technical personnel. Follow the recom-
mendations in "Section 5"·
Given that the system that you are going to install im-
proves the quality of the water you consume and is con-
sidered a food, All of the tools that you are going to use
for the assembly and installation must be clean and, un-
der no circumstances, contaminated or impragned with
grase, oils or rust. Please be extremely careful when
handling the materials that are going to be in contact
with treated or undertreated water.
(For further inmformation, please contact your distri-
butor.)
The installation of the equipment should be carried out
in this order.
A. System configuation.
B. Pipe connection.
C. Start-up of the system.
1. Untreated water.
1
6
3
4
5
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Kube 6Kube 15

Tabla de contenido