Test Operation; Configuration Of The Connection Pipe - Klarstein Windwaker Eco Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

TEST OPERATION

Preparation
• The client approves the air conditioner.
• Specify the important notes for air conditioner to the client.
Method of Test Operation
• Put through the power, press ON/OFF button on the remote controller to start
operation.
• Press MODE button to select AUTO, COOL, DRY, FAN and HEAT to check whether
the operation is normal or not.
Note: If the ambient temperature is lower than 16 °C, the air conditioner can't start
cooling.

CONFIGURATION OF THE CONNECTION PIPE

1. Standard length of connection pipe
• 5 m / 7,5 m / 8 m
2. Min length of connection pipe
• For the unit with standard connection pipe of 5m, there is no limitation for the min
length of connection pipe.
• For the unit with standard connection pipe of 7.5m and 8m, the min length of
connection pipe is 3m.
3. Max length of Connection Pipe
The maximum length of the connection line depends on the capacity of the air
conditioner (see table below).
Capacity
5.000 BTU/h (1465 W)
7.000 BTU/h (2051 W)
9.000 BTU/h (2637 W)
12.000 BTU/h (3516 W)
18.000 BTU/h (5274 W)
Max. length
Capacity
15
24.000 BTU/h (7032 W)
15
28.000 BTU/h (8204 W)
15
36.000 BTU/h (10548 W)
20
42.000 BTU/h (12306 W)
25
48.000 BTU/h (14064 W)
Max. length
25
30
30
30
30
EN
105

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

10033600100336011003360210033603

Tabla de contenido