Textron GREENLEE Ultra Tugger 6800-22 Manual De Operación página 38

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Setup (cont'd)
Chain Mount (cont'd)
1. On each vise chain unit:
a. Rotate the vise chain handle counterclockwise to
expose most of the threads. Leave only three or
four threads engaged in the handle.
b. Wrap the chain around the conduit.
Greenlee / A Textron Company
6800-22 Ultra Tugger
38
Cable Puller and Pulling Package
®
c. Pull the vise chain tight and insert the chain pins
into the chain pockets, or recesses.
d. Turn the handle clockwise to slightly tighten the
chain.
2. Set the puller into the cradle of the chain mount.
3. Install two pins from the motor side. Secure the pins
with two hitch pin clips.
Install Pins
from
Motor Side
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Publicidad

Tabla de contenido
loading

Tabla de contenido