2GIG Rely Guia Instalacion página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. With Panel front facing down, insert the lower two pedestal tabs
into Panel slots, followed by inserting and securing the pedestal
base by snapping the upper tabs into place.
3. Ensure the power wire routes through the opening located on
pedestal base for using the Panel on a flat surface.
Your Panel is ready for placing on a flat or horizontal surface.
System Setup
9

Publicidad

Tabla de contenido
loading

Tabla de contenido