Lutron Grafik Eye 3000 Serie Manual De Instrucciones página 7

Ocultar thumbs Ver también para Grafik Eye 3000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Wallbox
Mounting
Frame
EGRX-4S/4S-IR Mounting Diagram
System Communications
In order for Wallstations to communicate with a Control Unit, each Wallstation must be individually configured to "talk" by putting the Wallstation
in setup mode.
1. Put the Wallstation in setup mode (only one Wallstation can be in setup mode at a time).
NTGRX-4S/4S-IR/4B, EGRX Controls, GRX-4S-DW, NTGRX-2B-SL: Press and hold the buttons indicated for about 3 seconds, until the
LED(s) start cycling.
NTGRX-4S/4S-IR
Press here for
"talk"
LUTRON
LEDs cycle
NTGRX-4M/NTGRX-4PS: Press and hold the buttons indicated for about 3 seconds, until the first LED flashes.
Occupant Copy
Thread all four screws before tightening.
Carrier
Faceplate
NTGRX-4B
LUTRON
NTGRX-4M
LUTRON
Wall
Mounting
Frame
Wallbox
EGRX-4S/4S-IR Mounting Frame Orientation
EGRX-4S/4S-IR/-8S/-8S-IR
GRX-4S-DW
EGRX-2B-SL
LUTRON
NTGRX-4PS
1
2
3
4
PARTITION STATUS
OPEN
7
NTGRX-2B-SL
Installation Instructions

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Grafik eye 4000 serie

Tabla de contenido