Testing The Installation; Testing Voltage; Ct Reverse Phase Indicator; Load Leds - Leviton 1000 Serie Manual De Instalación

Ocultar thumbs Ver también para 1000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3
INSTALLATION INSTRUCTIONS
3.8

Testing the Installation

Testing Voltage

Voltage should be tested using an AC Voltmeter to verify that the voltage
across voltage line terminals (L1, L2, and L3 to Neutral) is not in excess of the
maximum rated voltage.

CT Reverse Phase Indicator

Series 1000 and Series 2000 meters have a red reverse phase indicator LED
as described in section 2.3. There must be a load drawing a minimum of 1
A connected to the meter in order for the reverse phase LED to function
correctly. If this LED is on (with sufficient load), power down the voltage supply
and verify that CTs are installed correctly.

Load LEDs

The load LEDs are described in section 2.3. These LEDs should be illuminating
at 50% duty cycle, appropriate to the load, when the meter is connected
properly, and a constant load is applied. Without a proper load, the load LEDs
could be on or off.

LCD Display

The Series 1000 and 2000 display is described in Section 2.4. From this
description, it is possible to determine if the kWh and/or demand values
displayed on the LCD are consistent with the applied load. A load must be
applied for the kWh value to show significant changes.
3.9

Securing the Enclosure

In accordance with safety requirements, enclosures must be secured using the
provided key lock once installation is complete. The purpose of the lock is to
prevent access to live parts that pose potential safety risks. To install the lock,
slide through the provided holes on the clamp side of the enclosure and
fasten securely.