Preliminary operations
2.2
CHECKING THE OPERATOR COMPONENTS
Before starting to fi t the operator, check that the package contains all
the components listed below and that the components are not
damaged.
Also check that the model code displayed on the operator packaging
corresponds to the code on the identifi cation plate of the operator
itself (B2).
2.2.1 List of components (B3)
1 - Self-tapping screw
2 - Screw
3 - Release lock
7 - Operator
8 - Upper cover
9 - Ring nut
10 - Screw
12 - Nut
13 - Ball joint
14 - Snap ring
15 - Rod casing
16 - Rod casing cover
17 - Rear mounting
18 - Bushing
19 - Rear pin
20 - Snap ring
21 - Fork pin
22 - Fork
23 - Self-locking nut
24 - Lower cover
25 - Front attachment
26 - Self-tapping screw
28 - Release attachment fl ange
29 - Capacitor
A - Complete front mounting assembly
B - Complete rear mounting assembly
C - Covers assembly
2.3
PREPARING THE MOUNTING
To mount the operator, a number of preparatory on-site jobs need to be done on the structure that is to be moved; for this, it is better to be
equipped with the correct tools, so that the installer is able to work independently.
Caution
The list of required tools is shown in the illustration and table (B4).
POS. TOOL
1
Male wrench 3
2
Screwdriver TC
Gripper for snap ring on shaft
3
Screwdriver TC
4
5
Combined wrench 10
6
Combined wrench 17
7
Combined wrench 14
8
Combined wrench 13
Screwdriver
9
USAG 280/3
USAG 326 TC/1
USAG 128 P/1025
USAG 326 TC/2
USAG 285/10
USAG 285/17
USAG 285/14
USAG 285/13
USAG 326/5x150
- 16 -
B2
B3
19 20 21 20
17
B
18
22
23
15
26
12 13 14
25
A
B4
3
7
8
6
R
8
C
3
7
16
29
3
4