Connect the Water Supply
Read all directions before you begin.
IMPORTANT:
Plumbing shall be installed in accordance with the
■
International Plumbing Code and any local codes and
ordinances.
The gray water tubing on the back of the refrigerator
■
(which is used to connect to the household water line) is a
PEX(cross-linked polyethylene) tube. Copper and PEX tubing
connections from the household water line to the refrigerator
are acceptable, and will help avoid off-taste or odor in your
ice or water. Check for leaks.
If PEX tubing is used instead of copper, we recommend the
following Whirlpool Part Numbers:
W10505928RP (7 ft [2.14 m] jacketed PEX),
8212547RP (5 ft [1.52 m] PEX), or
W10267701RP (25 ft [7.62 m] PEX).
Install tubing only in areas where temperatures will remain
■
above freezing.
If you turn on the refrigerator before the water line is
■
connected, turn off the ice maker to avoid excessive noise or
damage to the water valve.
Connect to Water Line
1. Unplug refrigerator or disconnect power.
2. Turn OFF main water supply. Turn ON nearest faucet long
enough to clear line of water.
3. Find a 1/2" to 1¹⁄
" (12.7 mm to 31.8 mm) vertical cold water
4
pipe near the refrigerator.
IMPORTANT:
Make sure it is a cold water pipe.
■
Horizontal pipe will work, but the following procedure
■
must be followed: Drill on the top side of the pipe, not the
bottom. This will help keep water away from the drill. This
also keeps normal sediment from collecting in the valve.
4. Determine the length of copper tubing you need. Measure
from the connection on the rear of the refrigerator to the water
pipe. Add 7 ft (2.1 m) to allow for cleaning. Use 1/4" (6.35
mm) O.D. (outside diameter) copper tubing. Be sure both
ends of copper tubing are cut square.
5. Using a cordless drill, drill a 1/4" hole in the cold water pipe
you have selected.
A. Cold water pipe
B. Pipe clamp
C. Copper tubing
D. Compression nut
6. Fasten the shutoff valve to the cold water pipe with the pipe
clamp. Be sure the outlet end is solidly in the 1/4" drilled hole
in the water pipe and that the washer is under the pipe clamp.
Tighten the packing nut. Tighten the pipe clamp screws
slowly and evenly so the washer makes a watertight seal. Do
not overtighten.
A
B
C
D
E
F
G
E. Compression sleeve
F. Shutoff valve
G. Packing nut
7. Slip the compression sleeve and compression nut on the
copper tubing as shown. Insert the end of the tubing into the
outlet end squarely as far as it will go. Screw compression nut
onto outlet end with adjustable wrench. Do not overtighten or
you may crush the copper tubing.
8. Place the free end of the tubing in a container or sink, and
turn ON the main water supply. Flush the tubing until water is
clear. Turn OFF the shutoff valve on the water pipe.
Connect to Refrigerator
1. Create a service loop (minimum diameter of 2 ft [61 cm])
with the copper tubing. Avoid kinks when coiling the copper
tubing.
2. Remove the plastic cap from water valve inlet port. Place a
compression nut and sleeve on the copper tubing.
3. Insert the end of the copper tubing into the water valve inlet
port. Shape tubing slightly so that the tubing feeds straight
into the port to avoid kinks.
4. Slide the compression nut over the sleeve and screw into the
water valve inlet port.
A. Plastic water tubing
B. Sleeve
5. Using an adjustable wrench, hold the nut on the plastic water
line to keep it from moving. Then, with a second wrench turn
the compression nut on the copper tubing counterclockwise
to completely tighten. Do not overtighten.
6. Check connection by pulling on copper tubing. Attach copper
tubing to refrigerator cabinet with a "P" clamp. Turn on water
supply to refrigerator and check for leaks. Correct any leaks.
Complete the Installation
WARNING
Electrical Shock Hazard
Plug into a grounded 3 prong outlet.
Do not remove ground prong.
Do not use an adapter.
Do not use an extension cord.
Failure to follow these instructions can result in death,
fire, or electrical shock.
1. Plug into a grounded 3 prong outlet.
NOTE: Allow 24 hours to produce the first batch of ice.
Discard the first three batches of ice produced. Allow 3 days to
completely fill the ice container.
A
B
C
D
C. Compression nut
D. Copper tubing
5