Implified Installation As Illustrated In; Ection 2.3) - Broan HRV150FL Manual Del Instalador

Ocultar thumbs Ver también para HRV150FL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. INSTALLATION (
CONT
3.5 I
D
NSTALLING THE
UCTWORK AND THE REGISTERS
3.5.3 S
I
IMPLIFIED
NSTALLATION
When performing duct connection to the furnace, installation must be done in accordance with all applicable
codes and standards. Please refer to your local building code.
When performing duct connection to the furnace ducts (Method 1), use metal ducts appropriately sized to support
the additional airflow produced by the HRV. It is recommended that the HRV is running when the furnace is in
operation in order to prevent backdrafting inside HRV.
There are two ways (illustrated below) of connecting the unit to the furnace ducts:
M
1: R
-S
ETHOD
ETURN
UPPLY
M
ETAL DUCT
THAN
VJ0086
S
:
TALE AIR INTAKE
• Cut an opening into the furnace return duct not less than 10 feet (3.1 m) from the furnace.
• Connect this opening to the stale air intake port of the HRV (as shown above).
F
RESH AIR DISTRIBUTION
Same instructions as for Method 1 or Method 2, section 3.5.2 in previous page.
If using Method 2, make sure the furnace blower is synchronized with the unit operation! See Section 5.
For Method 2 (Return-Return), make sure there is a distance of at least 3 feet (0.9 m) between the 2 connections to the furnace
duct.
NOTE: For Method 1, it is recommended, but not essential to synchronize the furnace blower operation with the HRV operation.
'
)
D
(
S
AS ILLUSTRATED IN
ECTION
M
INIMUM
18'' (0.5
)
M
A
B
A+B=
NOT LESS
10' (3.1
)
M
:
(
'
)
CONT
D
2.3)
!
WARNING
CAUTION
VJ0087
CAUTION
10
M
2: R
-R
ETHOD
ETURN
ETURN
A
M
A+B=
INIMUM
3' (0.9
)
M
THAN
B
NOT LESS
10' (3.1
)
M

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hrv190flHrv150flsHrv190fls

Tabla de contenido