2. TYPICAL INSTALLATION
The wearing of safety glasses and gloves is recommended when installing, maintaining or cleaning the unit to reduce the risk of injury
that could be caused by the presence of thin metal and/or moving parts.
2.1 M
(N
F
OUNTING
EW
RAME
8" ROUND DUCT
ADDITIONAL
1½" FRAMING
Blower factory-shipped
in straight through
discharge position.
Installed in new construction.
C
)
ONSTRUCTION
Mounting brackets
factory-shipped in position
for 1/2" ceiling material.
CEILING JOIST
(16" centers shown)
MOUNTING
SCREW
!
WARNING
2.2 M
OUNTING
8" ROUND DUCT
CEILING JOIST
(16" centers
shown)
MOUNTING
BRACKETS
(Attached to
opposite sides
of housing &
upside-down)
Installed in existing construction.
5
(E
F
C
XISTING
RAME
ONSTRUCTION
2 X 4 FRAMING
(wide side down)
)
FINISHED
CEILING
MATERIAL