CALIFORNIA PROPOSITION 65 WARNING what tools are necessary. This product contains chemicals known to the WARNING: State of California to cause cancer or birth defects or other reproductive harm. PENTEK GRO-2550 Installation and Operation Manual • 3...
Página 4
ABSOLUTELY NECESSARY to use a carbon pre-filter (included with the system). The carbon pre-filter should be changed at least every 6-12 months to avoid chlorine bypass. See Warranty for disclaimers and limitations that apply to the GRO-50EN element. 4 • PENTEK GRO-2550 Installation and Operation Manual...
Página 5
4. Installing the Drain Clamp NOTE: If you have a single-basin sink with a disposal unit, call Technical Support for options. NOTE: Before installing the drain clamp, check the drainpipes under the sink PENTEK GRO-2550 Installation and Operation Manual • 5...
Página 6
SHUT OFF VALVE TO TANK 7 1/2” FLOW RESTRICTOR MEMBRANE 15” (minimum) to oor INLET WATER TO DRAIN BACK VIEW TUBING CONNECTION DIAGRAM 1 1/2” (minimum) to oor CARBON SEDIMENT CARTRIDGE CARTRIDGE 6 • PENTEK GRO-2550 Installation and Operation Manual...
2 to 4 hours to fill the storage tank. As water is taken from the tank, the system automatically starts the cycle of replacing the water and then stops water production when the tank is full. Closed Tank Valve Open Tank Valve Counter- clockwise PENTEK GRO-2550 Installation and Operation Manual • 7...
Página 8
6 months to verify that your system is performing satisfactorily. SAMPLING INSTRUCTIONS: Sampling instructions are included with the Total Dissolved Solids (TDS) Test Kit. Total Dissolved Solids Test Kit 8 • PENTEK GRO-2550 Installation and Operation Manual...
10. Turn off the drinking water faucet. 11. Turn on water to RO system at cold water supply. 12. Turn on icemaker and open shut-off valve. Consult manufacturer’s instructions. 13. Check for leaks and tighten connections if necessary. PENTEK GRO-2550 Installation and Operation Manual • 9...
Página 10
Check to see if tube is in place by trying to gently pull tube out. 3/8" Faucet Permeate Tube 3/8" Drain Tube 1/4" Feed Tube 1/4" Faucet Drain Tube Carbon (2nd Stage) Prefilter 1/4" Storage Sediment (1st Stage) Prefilter Tank Permeate Tube 10 • PENTEK GRO-2550 Installation and Operation Manual...
Página 11
Check for leaks every hour. As pressure builds in tank, leaks may occur that did not exist directly after installation. When the RO element and cartridges have been changed, follow the system start-up procedure in Step 11: System Start-up. PENTEK GRO-2550 Installation and Operation Manual • 11...
TDS. Reduced production Slow or no product water flow usually indicates either a clogged pre-filter or an exhausted membrane. First, replace the pre-filters. If the production rate is not improved, replace membrane. 12 • PENTEK GRO-2550 Installation and Operation Manual...
Página 13
PARTS GUIDE For replacement parts, contact your nearest Water Filter dealer or call 800.279.9404 PENTEK GRO-2550 Installation and Operation Manual • 13...
Página 14
RO STORAGE TANK 244982 INSTALLATION KIT, GRO SYSTEM BPRO-50-S18 CLIP, DOUBLE 255521-43 STAGE 4, GAC POST FILTER 244790 TEE, 1/4" NPT X 1/4" TUBING QUICK CONNECT 244787 VALVE, AUTO SHUT-OFF Buyer Seller Date 14 • PENTEK GRO-2550 Installation and Operation Manual...
Efficiency Rating: 15.39% TDS Rejection: 96.8% System Tested and Certified by NSF International against NSF/ANSI Standard 58 and CSA B483.1 for the reduction of the claims specified on the Performance Data Sheet. PENTEK GRO-2550 Installation and Operation Manual • 15...
ADVERTENCIA RELACIONADA CON LA PROPUESTA 65 DE CALIFORNIA Este producto contiene productos químicos de los ADVERTENCIA: cuales el estado de California sabe causan cáncer o 16 • PENTEK GRO-2550 Installation and Operation Manual anomalías congénitas u otros daños reproductivos.
(incluido con el sistema). El prefiltro de carbón se deberá cambiar al menos cada -12 meses para evitar que el cloro pase. Vea la Garantía para leer las declinaciones y limitaciones que se aplican a la membrana GRO-50EN. PENTEK GRO-2550 Installation and Operation Manual • 17...
Página 18
Apriete la tuerca de vástago con una llave hasta que quede apretada. (K) Inserte firmemente la boca de cuello de ganso en la base de la llave. 18 • PENTEK GRO-2550 Installation and Operation Manual...
Página 19
MEMBRANA DE 7 1/2” ÓSMOSIS INVERSA AGUA DE ENTRADA 15" AL DESAGÜE (mínimo) al piso VISTA POSTERIOR DIAGRAMA DE CONEXIONES DE TUBERÍA 1 1/2" (mínimo) al piso CARTUCHO CARTUCHO DE CARBÓN DE SEDIMENTO PENTEK GRO-2550 Installation and Operation Manual • 19...
6 meses para verificar que el sistema esté funcionando satisfactoriamente. INSTRUCCIONES DE MUESTREO: Las instrucciones de muestreo se incluyen en el kit de prueba de sólidos disueltos totales (TDS). Kit de prueba de sólidos disueltos totales PENTEK GRO-2550 Installation and Operation Manual • 21...
11. Abra el paso de agua al sistema RO desde el suministro de agua fría. 12. Encienda el dispensador de hielo y abra la válvula de cierre. Consulte las instrucciones del fabricante. 13. Compruebe que no haya fugas y apriete las conexiones si es necesario. 22 • PENTEK GRO-2550 Installation and Operation Manual...
3/8" desagüe de 3/8" Tubo de alimentación de 1/4" Tubo de desagüe de llave de 1/4" Prefiltro (2ª etapa) de carbón Tubo permeable Prefiltro (1ª etapa) de sedimento del tanque de almacenamiento de 1/4" PENTEK GRO-2550 Installation and Operation Manual • 23...
Cuando se hayan cambiado el elemento de ósmosis inversa y los cartuchos, siga el procedimiento para iniciar el sistema del Paso 11. Inicio del sistema 24 • PENTEK GRO-2550 Installation and Operation Manual...
GRO, o es posible que la tubería de control de flujo de agua de salmuera (o de desagüe) esté obstruida. Consulte con su distribuidor o plomero para comprobar los sólidos disueltos totales del agua de producto. PENTEK GRO-2550 Installation and Operation Manual • 25...
Página 26
GUÍA DE PARTES Para obtener piezas de repuesto, comuníquese con su distribuidor de Filtro de Agua más cercano o llame al 800.279.9404 26 • PENTEK GRO-2550 Installation and Operation Manual...
Página 27
ALMACENAMIENTO DE RO 244982 KIT DE INSTALACIÓN, SISTEMA GRO BPRO-50-S18 CLIP, DOBLE 255521-43 ETAPA 4, POSFILTRO GAC 244790 “T", 1/4" NPT X 1/4" TUBERÍA DE CONEXIÓN RÁPIDA 244787 VÁLVULA, CIERRE AUTOMÁTICO Comprador Vendedor Fecha PENTEK GRO-2550 Installation and Operation Manual • 27...
El sistema fue probado y certificado por NSF International bajo las Normas 58 de NSF/ANSI y B483.1 de CSA en cuanto a la reducción de las afirmaciones especificadas en la Hoja de información sobre rendimiento. 28 • PENTEK GRO-2550 Installation and Operation Manual...
à l’installation. Lisez les procédures d’installation avant considérés par l’État de Californie comme de commencer afin de déterminer de quels outils vous pouvant causer des cancers, des malformations congénitales et d’autres troubles du système aurez besoin. reproducteur. PENTEK GRO-2550 Installation and Operation Manual • 29...
être remplacé au moins tous les 6 à 12 mois afin de prévenir le passage inopiné de chlore. Voir la garantie pour connaître les exclusions et les limitations qui s’appliquent à l’élément GRO-50EN. 30 • PENTEK GRO-2550 Installation and Operation Manual...
Página 31
(J) Centrez le robinet et glissez le disque fendu entre le séparateur blanc et le dessous du comptoir ou de l’évier. Serrez l’écrou de manœuvre à l’aide d’une clé jusqu’au serrage complet. (K) Insérez fermement le col de cygne dans la base du robinet. PENTEK GRO-2550 Installation and Operation Manual • 31...
Página 32
7 1/2 po MEMBRANE OI 15 po ARRIVÉE D'EAU (minimum) VERS L'ÉVACUATION du plancher VUE ARRIÈRE DIAGRAMME DES RACCORDS DE TUYAU 1 1/2 po (minimum) du plancher FILTRE AU FILTRE À CHARBON SÉDIMENTS 32 • PENTEK GRO-2550 Installation and Operation Manual...
Página 33
À mesure que de l’eau est prélevée du réservoir, le système amorce automatiquement le cycle de remplacement, puis arrête Ouvrir la vanne de réservoir de produire de l’eau lorsque le réservoir est plein. Sens antihoraire PENTEK GRO-2550 Installation and Operation Manual • 33...
INSTRUCTIONS D’ÉCHANTILLONNAGE : Des instructions d’échantillonnage sont fournies dans votre trousse d’analyse des matières dissoutes totales (MDT). Trousse d’analyse des matières dissoutes totales 34 • PENTEK GRO-2550 Installation and Operation Manual...
Página 35
12. Mettez en marche la machine à glaçons et ouvrez la vanne de coupure. Consultez les directives du fabricant. 13. Vérifiez s’il y a des fuites et resserrez les raccords au besoin. PENTEK GRO-2550 Installation and Operation Manual • 35...
Página 36
3/8 po Tuyau d’évacuation de 3/8 po Tuyau d’alimentation de 1/4 po Tuyau de perméat – robinet, 1/4 po Préfiltre au charbon (2e étape) Tuyau de perméat – réservoir de stockage, Préfiltre pour sédiments (1re étape) 1/4 po 36 • PENTEK GRO-2550 Installation and Operation Manual...
Página 37
À mesure que le réservoir monte en pression, il peut survenir des fuites qui n’étaient pas présentes immédiatement après l’installation. Lorsque l’élément OI et les cartouches ont été remplacés, suivez la procédure décrite à l’étape 11 : Démarrage du système. PENTEK GRO-2550 Installation and Operation Manual • 37...
GRO doive être remplacé ou que le tuyau du régulateur de débit de saumure (eau usée) soit colmaté. Demandez à votre détaillant ou à un plombier de vérifier la teneur en MDT de l’eau filtrée. 38 • PENTEK GRO-2550 Installation and Operation Manual...
Página 39
GUIDE DES PIÈCES Pour obtenir des pièces de rechange, communiquez avec le détaillant de filtres à eau le plus près de chez vous ou composez le 1 800 279-9404. PENTEK GRO-2550 Installation and Operation Manual • 39...
Página 40
RÉSERVOIR DE STOCKAGE, OI 244982 TROUSSE D’INSTALLATION, SYSTÈME OI ÉCOLOGIQUE BPRO-50-S18 CLIP, DOUBLE 255521-43 POST-FILTRE CAG, 4E ÉTAPE 244790 TÉ, TUYAU DE 1/4 PO NPT X 1/4 PO, RACCORDEMENT RAPIDE 244787 VANNE, FERMETURE AUTO Acheteur Vendeur Date 40 • PENTEK GRO-2550 Installation and Operation Manual...
Página 41
Rejet de MDT : 96,8 % Système mis à l’essai et homologué par NSF International en regard des normes NSF/ANSI 58 et CSA B483.1 pour la réduction des substances indiquées dans la fiche technique du produit. PENTEK GRO-2550 Installation and Operation Manual • 41...
Página 42
42 • PENTEK GRO-2550 Installation and Operation Manual...
Página 43
PENTEK GRO-2550 Installation and Operation Manual • 43...
Página 44
For a detailed list of where Pentair trademarks are registered, please visit waterpurification.pentair.com/brands. § Pentair trademarks and logos are owned by Pentair plc or its affiliates. Third party registered and unregistered trademarks and logos are the property of their respective owners.