Briggs & Stratton Dual 200 Amp Manual De Instrucciones página 9

Ocultar thumbs Ver también para Dual 200 Amp:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

12. Plug current transformer leads into "CT1" and "CT2"
terminals (E1 and E2) on transfer switch control board.
13. Connect conductor from transfer switch neutral terminal (H1
or H2) to generator NEUTRAL terminal. Observe generator
control panel labeling for terminal identification.
14. Connect conductor from transfer switch "GND" terminal
(U1 and U2) to generator control panel "GROUND" terminal.
Assure generator equipment grounding conductor (G) is
connected per applicable federal, state and local codes,
standards and regulations.
15. Using minimum #14 AWG conductors, connect the transfer
switch "UTILITY 240 VAC" terminals to generator's "240
VAC" terminals via two-pole connector supplied
with generator (P).
16. Using #18 AWG twisted pair conductors, no greater than
200 ft. in length, 300 volt 75°C-90°C, connect "T/R" and
"GND" terminals (B) on transfer switch control board to the
generator's control panel "TxRx" and "TxRx GND" terminals
via ten pin connector (A) supplied with generator. Count
down to the proper pin location on the generator control
board since visual alignment with its decal can be misleading:
A
OR
A
17. Tighten all wire connections/fasteners to proper torque.
B
B
See label inside transfer switch enclosure or values listed in
remote module installation instructions for proper
torque values.
9

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Split 400 amp

Tabla de contenido