KPA 03
Digital clamp multimeter
Testing Diode
1.
Connect the black test lead to
the COM jack and the red test
lead to the V jack. (The polarity
of red lead is" + ")
2.
Set the rotary switch at
position and connect red
lead to the anode, black lead
to the cathode of the diode
under testing. The meter will
show the approx. forward
voltage of the diode. If the lead
connection is reversed, only
figure"1"displayed.
Continuity Test
1.
Connect the black test lead to
the COM jack and the red test
lead to the V jack. (The polarity
of the red lead is positive" + ")
2.
Set the rotary switch at
position and connect test leads
across two points of the circuit
under testing. If continuity
exists (i.e., resistance less than
about100 ), built -in buzzer will
sound.
WARNING
To avoid electric shock, be sure the
thermocouple has been removed
before changing to another
function measurement.
Instructions manual |
18
Measuring Frequency
1.
Connect the black test lead to
the COM jack and the red test
lead to the V jack.
2.
Set the rotary switch at Hz
position and connect test leads
across the source or load under
measurement.
NOTE:
1.
Reading is possible at input
voltage above 10V rms. but the
accuracy is not guaranteed.
2.
In noisy environment, it is
preferable to use shield cable for
measuring small signal.
Specifications
Accuracy is specified for a period of
one year after calibration and at 18°C
to 28°C (64°F to 82°F) with relative
humidity to 80%.
www.grupotemper.com