Stenner Pumps ECON T Serie Manual De Uso página 17

Ocultar thumbs Ver también para ECON T Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION
INSTALL SUCTION LINE TO PUMP HEAD
1. Uncoil the suction/discharge line. Use outside of solution tank as a guide to cut
proper length of suction line ensuring it will be 2-3" above the bottom of solution tank.
Allow sufficient slack to avoid kinks and stress cracks. Always make a clean
square cut to assure that the suction line is burr free. Normal maintenance
requires trimming.
Suction lines that extend to the bottom of the tank can result in debris pickup
leading to clogged injectors and possible tube failure.
2. Make connections by sliding the line(s) through connecting nut and ferrule and finger
tighten to the corresponding tube fittings.
3. Finger tighten nut to the threaded tube fitting while holding the tube fitting.
Over tightening the ferrule and nut with a wrench may result in damaged fittings,
crushed ferrules, and air pick up.
DO NOT use thread sealant tape on pump tube connections or tools to
tighten connections.
Finger tighten
nut
Discharge Line
continued
Ferrules
NOTE: Beveled ends of ferrules
face pump.Tubing should
bottom into all fittings.
Suction Line
USA and Canada 800.683.2378, International 904.641.1666
DO NOT use Teflon tape
on pump tube threads.
DO NOT use pliers.
17
Econ T

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido