Unpacking And Inspection; Operation - Amprobe ACD-45PQ Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

UNPACKING AND INSPECTION

Your shipping carton should include:
1 ACD-45PQ 600A Power Quality Clamp
1 Test Leads (Black x 1; Red x 1)
1 Bag
1 Users Manual
2 1.5V AAA LR03/NEDA 24A Batteries (Installed)
If any of the items are damaged or missing, return the complete package to
the place of purchase for an exchange.

OPERATION

CAUTION
Before and after hazardous voltage measurements, test the voltage
function on a known source such as line voltage to determine proper
meter functioning.
3

Publicidad

Tabla de contenido
loading

Tabla de contenido