The hopper is secured with 4 screws in the body of the boiler, it is very important for the correct operation
and safety of the system to be perfectly watertight and thus prevent the fire from moving back through that
area.
The electrical connection will go directly to the electrical panel in the indicated area (see figure).
5.8.
Remove the upper cover of the hopper and mount the pneumatic aspirator, tightening the 4 screws on the
aspirator with respect to the hopper.
Connect to the electrical panel passing the two cables through the lower grommets. We currently ship it with
fast connections.
220VAC
5.9.
Assembling the fuel shutoff valve. It will be mounted on the suction tube of the suction system and its
electrical connection to the electrical panel (see figure).
Once the electrical connection has been made, we must connect the suction hoses, see manual for the
pneumatic vacuum system. The earthing of the pipes and the suction system is mandatory.