Putting Into Operation - Abicor Binzel FES-200 W3 Manual De Instrucciones

Ocultar thumbs Ver también para FES-200 W3:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation

NOTICE
• When mounting the new filter cartridge, make sure to touch only the bottom of the filter. Otherwise the filter material
may become damaged, which will destroy the filter cartridge.
13 Place the pin and the sponge rubber seal of the new filter cartridge (5) into the locking mechanism.
14 Press the filter cartridge (5) slightly downwards into the locking mechanism.
15 Fix the filter cartridge (5) by turning it to the right (clockwise direction).
16 Make sure that the filter cartridge is fixed on all locking points.
NOTICE
• Make sure that the cables and hoses are not kinked, caught or damaged.
17 Insert the cover with the mounted new filter cartridge into the fume extraction system.
18 Tighten the mounting screws (3).
6 Putting into operation
DANGER
Risk of injury due to unexpected start
The following instructions must be adhered to during all maintenance, servicing, assembly, disassembly and repair work:
• Switch off the power source.
• Disconnect all electrical connections.
NOTICE
• The fume extraction system must be mounted on a plane surface near the work area.
4
1
Fume extraction system FES-200 W3
2
Extraction hose (cable assembly)
Fig. 7
Putting into operation
EN - 16
3
Start-stop pliers, 4-pole (may differ from
shown)
1
2
3
4
Torch system
BAL.0335.0 • 2019-08-16
FES-200 W3

Publicidad

Tabla de contenido
loading

Productos relacionados para Abicor Binzel FES-200 W3

Tabla de contenido