Installation; First Switch-On - Faro SK07 Serie Manual De Uso

Ocultar thumbs Ver también para SK07 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION

thE DEViCE MUst BE instALLED BY sPECiAList
tEChniCiAns.
Check the installation space ensures the minimum space indicated can be maintained.

First switCh-on

Qualify the installation according to the following test table:
– Vacuum test
– Automatic control test
– Verification of the measuring instrumentsof the sterilizer
– Overheat cutout test
– Thermometric test for small load (*)
– Small load dryness test (*)
– Steam penetration test for porous loads (*)
– Thermometric test for solid load (*)
– Solid load dryness test (*)
– Steam penetration test for solid loads (*)
– Thermometric tests (load selectedon user requirements)
– Microbiological tests (load selectedon user requirements)
(*)To be carried outwithcyclesof 121°Cand 134°C
660 (16) - 760 (21)
660
410 (16) - 470 (21)
410
520 (16) - 580 (21)
521
the door has the following open dimensions:
DiMEnsions MoDELs 16-21
30
20
421
450
20
408
403
37 37

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido