Connection and start-up
Connection of a
water cooling unit
(OMEGA
400/550 C)
2
1. Place the welding machine on top of the cooling
unit and mount the fitting (1).
2. Pull the power cable (2) through the hole on the
rear side of the machine. Dismount the protection
fitting (3) in the wire chamber and insert the 4-pole
plug (4). Remount the protection fitting.
3. Dismount the two screws (5) on the fitting with the
quick connections (6).
4. Pull out and turn the fitting so that the quick con-
nections turn up. Then remount the fitting with the
screws (5) (see drawing).
5. Mount the flow hose on the water-cooled torch in
the quick connection marked blue and the return
hose in the quick connection marked red.
6. The cooling liquid level should be inspected
regularly by means of the level control (7).
7. Refill of cooling liquid takes place through the filler
neck (8).
2
1
5
5
3
4
6
5
8
5
7
Switch on, press, weld
Welding program setting
•
Switch on the welding machine on the main switch
(2)
•
Select welding program or material/gas/wire
ADVANCED II
SYNERGIC
mm
Please read how this should
be selected on your welding
machine in the quick guide.
Select the setting that
fits the required wire and
shielding gas.
•
Adjust the welding current and secondary
parameters. Please read your quickguide
•
The machine is now ready to weld
WARNING
When you activate the torch
trigger, there is voltage applied to
the welding wire/electrode.
Software reading
•
Insert the SD card into
the machine's card
reader as shown in the
drawings.
•
Turn on the machine.
•
The display flashes
shortly with three lines
•
Wait until the set current
is displayed.
•
Turn off the machine and
remove the SD card.
•
The machine is now
ready for use.
It is necessary to read software inside the new control
unit by means of a SD card, if the control unit has been
exchanged. The software can be downloaded from
www.migatronic.com
14
dimension. (Depending
on the model).