1 Mount the socket joint.
Before doing this, apply grease to
the ball bearing joint and the piston
rod.
4 Mount the operator on the rear
support.
ø
Vertical pin:
=12mm, L=37mm
7 Loosen the discharge screw (P).
If the operator has to be dismounted,
retighten the screw in order to
prevent the oil from leaking out.
Levelling
Assembly
2 Mount the fork.
ø
Horizontal pin:
=10mm, L=57.2mm
5 Mount the operator on the front
support. Before doing this, apply
grease to the ball bearing joint and the
support pin.
Models with slowdown: adjust the
socket joint in order to achieve the
required slowdown distance.
8 Mount the gland and introduce the
cables.
VU models have 4 cables; VUS models
have 6 cables.
The operator must work horizontally:
to do this, the supports must be
positioned with a height difference of
19 mm.
Check horizontality with a spirit level.
3 Mount the supports. Carry out
t h e w e l d i n g w i t h t h e o p e r a t o r
withdrawn to a distance, in order to
p r e v e n t t h e s p i n d l e f r o m b e i n g
damaged by the welding.
6 Mount the cover and the top.
9 Complete the electrical connections
as shown in the section below. Then
position the cover (T) and tighten the
gland.
11