Important; Installation Procedure - Atmor Thermo Boost 10.5 kW Guía De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly Instructions
01
Connect the pressure relief device (PRD)
to the unit (Figure 1)
IMPORTANT – Do not omit this step.
A PRD must be installed.
03
Disconnect the cables
from the PCB within
the unit. (Figure 3)
05
Connect the incoming water line to the
heater inlet (on left side), and connect
the outgoing water line to the heater
outlet (on right side).
Use a hose that can withstand pressure
up to116 psi (8 bar) (Figure 5).
07
Make sure power to the unit is shut off by means of the dedicated
circuit breakers on the main electrical panel.
Run the power cable wires from the circuit breakers on the main
electrical panel to the water heater.
Connect the power cable to the terminal block within the unit.
Make sure the correct breaker size and wire gauge have been used.
Make sure all wire connections are tight and secure.
Make sure the unit is connected to a ground in accordance with
applicable codes. (Figure 6)
04
Mount the unit on the wall with 4 screws
at the marked points. (Figure 4)
Make sure the unit is horizontally level,
with water inlets and outlets at the
bottom. (Figure 5)
02
Remove the appliance
covers (Figure 2).
06
Run water through the
unit for one minute, and
make sure there are no
leaks.
6

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Thermo boost 14 kw

Tabla de contenido