E
LECTROBRAKE RELEASE KNOB ASSEMBLY PROCEDURE ACJ9019
1° - Insert the steering compass (B) into the cable (A).
2° - Insert the sheated cable (C) along the cable (A).
3° - Insert the compass (D) onto the cable (A).
4° - Insert part (E) paying attention that part (F) has been completely
screwed.
R
ELEASE
To safely carry out the movement of the rolling gate it is important to
verify that:
- There are handles on the rolling gate.
- Their position does not create dangerous points during the use;
- The manual effort to move the rolling gate must not exceed 225N for
the doors located in private sites and 390N for the doors located in
M
AINTENANCE
To be undertaken only by specialized staff after disconnecting power
supply.
Every two years it is advisable to check if the screws of the pulley and the
screw fixing to the shaft are tighten.
5° - Insert the compass with the blocking screw (G) against part (F) and
tighten the hexagonal screw with a key n° 7.
6° - Fix part (H) with part (F).
commercial or industrial sites (values indicated in point 5.3.5 of EN
12453 standard).
ATTENTION: the activation of the release can cause an incontrollable
movement of the rolling gate in case the latter is not perfectly balanced.
Check that the springs are properly balanced and lubricate the guide with
silicone grease.
27
27
G
B