Fig. F
4
4.1
-
-
-
-
14
6
-
4.2
Adjust the pressure on the pump as
necessary to set the torque. For a
complete list of torque settings, refer to
the table in the back of the manual.
4.3
•
•
•
•
Operation
Prior to operation
Make sure the nut or bolt to be
fastened is clean and free of dust.
Make sure the nut or bolt runs
correctly on the thread.
Make sure that the threads and the
bearing surface are liberally coated
with the correct lubricant or anti-
seizure compound.
Make sure that the spanner used to
keep the nut or bolt on the opposite
end in place, is of the correct size and
that there is an adequate abutment
surface.
Contact Enerpac if a suitable reaction
point is not available. Enerpac has
extensive experience with providing
special reaction devices.
To set the torque
To operate the tool (fig. F)
Position the reaction foot (6) against
a suitable reaction point (14).
The reaction point will counteract the
force caused by operating the tool.
Start the pump.
Operate the tool to tighten or loosen
the nut or bolt.
Stop the pump immediately after
work has finished.
Do not strike the tool, socket or nut
with a hammer while under a full load.
9