Engine Oil; Pre-Operation Check; Grounding Instructions - Echo EGi-1200 Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TIP:
Pre-operation checks should be made each time the generator is used.

Pre-operation check

Fuel (See page 14)
• Check fuel level in fuel tank.
• Refuel if necessary.
Engine oil (See page 14)
• Check oil level in engine.
• If necessary, add recommended oil to specified level.
• Check generator for oil leakage.

GROUNDING INSTRUCTIONS

Improper connection of the equipment grounding
conductor can result in a risk of electrocution.
Check with a qualified electrician if you are in doubt as to whether the unit is
properly grounded for your local regulations.
The ground terminal on the frame can be used to connect the generator to a
suitable ground source. The ground path should be made with #8 size wire.
Connect the grounding wire securely to the ground terminal. Connect the
other end of the wire securely to a suitable ground source.
A metal underground water pipe in direct contact with the earth for at least
10 ft (3.0m) can be used as a grounding source. If a pipe is unavailable, an
8 ft (2.4m) length of pipe or rod may be used as the ground source. The pipe
should be 3/4" (1.9cm) diameter or larger and the outer surface must be
noncorrosive. If a steel or iron rod is used it should be at least 5/8" (1.6cm)
diameter and if a nonferrous rod is used it should be at least 1/2" (1.2cm)
diameter and be listed as material for grounding. Drive the rod or pipe to
a depth of 8 ft (2.4m). If a rock bottom is encountered less than 4 ft (1.2m)
down, bury the rod or pipe in a trench. All electrical tools and appliances
operated from this generator, must be properly grounded by use of a third wire
or be "Double Insulated".
It is recommended to:
1. Use electrical devices with 3 prong power cords.
2. Use an extension cord with a 3 hole receptacle and a 3 prong plug at
the opposite ends to ensure continuity of the ground protection from
the generator to appliance.
We strongly recommend that all applicable regulations relating to grounding
specifications be checked and followed.
16
DANGER
PREPARATION

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido