Descargar Imprimir esta página

Yakima Q-TOWERS Manual Del Usuario página 5

Ocultar thumbs Ver también para Q-TOWERS:

Publicidad

Idiomas disponibles

Idiomas disponibles

Prepare for
Overview
installation
Position Towers in Front.
• Clean vehicle roof where towers will set.
• Set the assembly on the roof.
Set M2.
• uSE THE m2
mEASuREmENT you
identified in step 4.
• measure the shortest
distance from leading edge
of tower base to nearest
painted roofline corner.
• Once positioned DO NOT
mOVE.
TIP: Verify this measurement repeatedly during installation.
To continue front tower installation skip to step 17.
1033430H-5/33
Install towers
Install towers
in front
in rear
YOU ARE
HERE
Perform safety
checks
fRONT Of VEHICLE

Publicidad

loading