Panasonic UX09 E5 Serie Manual De Instalación página 4

Unidad exterior de bomba de calor de aire a agua
Ocultar thumbs Ver también para UX09 E5 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
CONNECTING THE PIPING
3
Do not over tighten, over tightening cause gas leakage.
Model
UX09*E5*, UX12*E5*, UD12*E5*, UD16*E5*,
UX09*E8*, UX12*E8*, UX16*E8*, UD09*E8*,
UD12*E8*, UD16*E8*
CONNECTING THE PIPING TO OUTDOOR UNIT
Decide piping length and then cut by using pipe cutter. Remove burrs
from cut edge. Make fl are after inserting the fl are nut (locate at valve)
onto the copper pipe. Align center of piping to valves and then tighten
with torque wrench to the specifi ed torque as stated in the table.
Local pipes can project in any of four directions.
Make holes in the pipe panels for the pipes to pass through.
Be sure to install the pipe panels to prevent rain from getting
inside the outdoor unit.
[Removing the service panel].
(1) Remove the three mounting screws.
(2) Slide the service panel downward to release the pawls.
After this, pull the service panel toward you to remove it.
Forward
direction
Mounting
screws
Be sure to use two spanners
to tighten. (If the nuts are
overtightened, it may cause the
fl ares to break or leak.)
Close the tube joining area with
putty heat insulator (local supply)
without any gap as shown in right
fi gure. (To prevent insects or small
animal entering.)
4
CAUTION
Piping size (Torque)
Gas
ø15.88mm
(5/8")
[65 N•m]
Service panel
Rear direction
Rear pipe panel
Side panel
Front pipe panel
Downward
direction
Do not attach
the spanners
here
Putty or Heat
insulator
(local supply)
CUTTING AND FLARING
1. Please cut using pipe cutter and then remove the burrs.
2. Remove the burrs by using reamer. If burrs is not removed, gas
leakage may be caused. Turn the piping end down to avoid the
metal powder entering the pipe.
3. Please make fl are after inserting the fl are nut onto the copper
Liquid
pipes.
ø9.52mm
(3/8")
[42 N•m]
Point
down
1. To cut
2. To remove burrs
 Improper fl aring 
Inclined Surface
damaged
EVACUATION OF THE
4
EQUIPMENT
WHEN INSTALLING AN AIR-TO-WATER HEAT PUMP, BE SURE TO
EVACUATE THE AIR INSIDE THE UNIT AND PIPES in the following
procedure.
Indoor unit
Vacuum
pump
adaptor
Vacuum
pump
1. Connect a charging hose with a push pin to the Low side of a
charging set and the service port of the 3-way valve.
Be sure to connect the end of the charging hose with the push
pin to the service port.
2. Connect the center hose of the charging set to a vacuum pump
with check valve, or vacuum pump and vacuum pump adaptor.
3. Turn on the power switch of the vacuum pump and make sure that
the needle in the gauge moves from 0 cmHg (0 MPa) to –76 cmHg
(–0.1 MPa). Then evacuate the air approximately ten minutes.
4. Close the Low side valve of the charging set and turn
off the vacuum pump. Make sure that the needle in the
gauge does not move after approximately five minutes.
Note :
BE SURE TO FOLLOW THIS PROCEDURE IN ORDER
TO AVOID REFRIGERANT GAS LEAKAGE.
5. Disconnect the charging hose from the vacuum pump and from the
service port of the 3-way valve.
6. Tighten the service port caps of the 3-way valve at a torque of
18 N•m with a torque wrench.
7. Remove the valve caps of both of the 2-way valve and 3-way
valve. Position both of the valves to "OPEN" using a hexagonal
wrench (4 mm).
8. Mount valve caps onto the 2-way valve and the 3-way valve.
Be sure to check for gas leakage.
THE PIPING
Pipe
Handle
Reamer
Bar
Yoke
Core
Clamp
Red arrow mark
handle
3. To fl are
When properly fl ared, the internal
surface of the fl are will evenly shine
and be of even thickness. Since the
fl are part comes into contact with the
Cracked
Uneven
connections, carefully check the fl are
thickness
fi nish.
Liquid side
Two-way valve
Gas side
Three-way valve
CLOSE
OPEN
0 – 0.5 mm
Bar
Copper
pipe
Outdoor unit
Close
Close

Publicidad

Tabla de contenido
loading

Tabla de contenido